Vertical ladle drying station with secondary air, TWIN blower system
Hydraulic lid swivelling 90° Burner power 1500 kW Secondary air approx. 1500 Nm³/h Additional oxygen injection for tempering Heating times between 8 h and 100 h Max. temperature 1200°C Optional with MEFKON combined oxygen-air-gas burner (MEFKON OAG Burner)
Vertical ladle drying station with rim suction system and post combustion
Hydraulic lid swivelling 90° Burner power 1500 kW Rim suction and post combustion 2000 Nm³/h Additional oxygen injection for tempering Heating times between 8 h and 100 h Max. temperature 1200°C
MEFKON designs and manufactures systems for the drying and heating of all types of vessels with refractory materials during the production of hot metal and steel.
Our company was founded in 2010 by a team of industry experts with extensive, long-standing experience in building heating systems. Each team member has on-site experience in steelworks, altogether more than 130 years. In total, our specialists have engineered, manufactured and commissioned approx. 800 heating systems for several steel plants all over the world.